Day 16 ~ They finished up the stone work on the pool today. This was the slowest process on the pool so far. They started last Wednesday I believe and finished up today. It didn't seem like there was a lot of stone work to be done, but I guess trying to fit all those pieces together like a puzzle times time.
The spa has a lower shelf that will be a waterfall feature.
These are the two additional waterfalls on the back beam of the pool.
A close up of one of the water features.
This is what the pool looks like today. I believe that the next step is installing the gas line. After that we should see them starting to form up for the decking!!!