This has been such a busy week at the house. Besides starting on the pool we have been having some repair work done on a inside leak we had. It has been crazy, but we can see a light at the end of the tunnel. It looks like everything should be back to normal by the end of this week.
Day 7~ Just like I thought Wednesday and Thursday of last week were pretty quiet. However, there were still workers here both of the days getting things done. On Wednesday they came and cut a two foot channel out of our drive way that will be used for the pool's plumbing lines. It rained Wednesday and Thursday, but was sunny and clear on Friday which worked out perfectly for the Gunite to be installed.

The Gunite crew showed up first thing Friday morning. It was quite a big crew with 2-3 concrete trucks.

After I snapped the first picture I came back and all I saw were tarps that they had put up to protect the house, so I had to take the rest of the pictures from the game room upstairs.

Just getting started spraying the Gunite.

This after only 10 minutes or so.

This was pretty amazing to watch. These men take this big blob of concrete that has been sprayed all over and start to sculpt it into our swimming pool. I have to admit that I spent quite a bit of time Friday watching them work.

Gwynie really enjoyed watching them too!
This is where we were on Friday. YEAH...It looks like a Pool!!!!
Saturday they came and dug all the trench lines and installed all (there were a ton) of plumbing lines.
And here is where we are today. All it needs is water right? Well not yet. I believe the next step is to put in the tile border that will be along the water line of the finished pool. They are scheduled to start pouring the deck around the pool in a couple of weeks.