The next step is to have the rebar and gas line work inspected today. If they pass the inspections and the weather cooperates they will pour the decking on Monday morning.
Friday, May 2, 2008
Pool Update #7
Day 26~ Last week was a pretty quiet week as far at the pool's construction goes, but things picked back up yesterday and it was a busy day. They put all the forms up for the decking that surrounds the pool. They also laid all the rebar and the gas line was run in the deck framing for the grill.
This is a picture showing the existing porch connection to the new decking. We had them demo the bricks off the existing patio and they are going to poor the decking material over it so that the decking material in continuous everywhere.
Standing behind the spa looking back at the house. You can see where they have framed for the two steps that will get you from the porch level to the pool level.
This picture gives you an idea of the elevation changes that the deck will have.
The picture shows the overall pool decking design and where the grill island will be located.