Sunday, May 4, 2008

Pool Update #8

Day 28 ~ They poured the decking on Saturday, here are a few pictures...

The porches new veneer and the extended patio
Looking back at the house from behind the spa
The raised sitting area
This is the overall decking of the pool. The grill island will be built where the electrical and gas lines are sticking up on the bottom left.

I believe the next step is the rock retaining walls for the flower beds and they will begin construction on the grill island sometime soon. The only thing left to do on the pool is the interior finish and to fill it. However, before they can do that they will add the decorative arbor and porch cover that are part of the overall design.

No comments: